top of page

Pressure Vessel Inspections


How to Prepare for a Statutory Boiler Audit
Prepare for statutory boiler audit with orderly AS 3788 records, evidence of safe operation and an independent review of deficiencies before inspection.
1 day ago


Pressure Equipment Risk Management Guide
A pressure equipment risk management guide for Australian asset owners: apply AS 3788 inspection, controls and records to protect people and production.
3 days ago


How to Manage Inspection Nonconformances at Plant
Learn how to manage inspection nonconformances in pressure equipment, protect compliance, prioritise risk and maintain defensible inspection records.
5 days ago


Are Pressure Vessels Registered in South Australia?
Are pressure vessels registered in South Australia? Learn when plant and design registration applies, and how AS 3788 inspections support legal compliance.
Oct 26


Steam Plant Risks That Demand Early Action
Steam plant risks extend beyond boiler failure. Learn how inspection, records and safe operation protect people, production and compliance obligations.
Oct 24


How to Select a Vessel Inspector for Your Plant
Learn how to select a vessel inspector with AS 3788 knowledge, AICIP accreditation and independent judgement for safe, compliant pressure equipment.
Oct 22


Vessel Integrity and Safe Pressure Equipment Operation
Vessel integrity depends on more than inspection intervals. Learn how condition assessment, records and AS 3788 support safe operation and compliance.
Oct 20


Third Party vs Owner Inspections: Key Differences
Third party vs owner inspections for pressure equipment: compare independence, AS 3788 compliance, scope and records for safer Australian plant sites.
Oct 18


Third Party Boiler Certification for SA Plant
Third party boiler certification gives Australian operators independent evidence of condition, AS 3788 compliance and priorities for safe boiler operation.
Oct 16


Risk Based Versus Calendar Inspections Explained
Risk based versus calendar inspections: understand how AS 3788 inspection planning supports safe, compliant pressure equipment operation and decisions.
Oct 14


AICIP Inspector Requirements for Pressure Equipment
Understand AICIP inspector requirements, AS 3788 competency, and checks to make when appointing an in-service inspector for pressure equipment in Australia.
Oct 12


How to Develop a Pressure Equipment Register
Develop a pressure equipment register for AS 3788 inspection planning, traceable records, risk control, safer decisions and reliable plant operations.
Oct 10


Boiler Compliance Checklist for Australian Plant
Use this boiler compliance checklist to manage AS 3788 inspections, records, safety controls and certification across Australian industrial plant safely.
Oct 8


Pressure Vessel Corrosion Case Study in Practice
Pressure vessel corrosion case study showing how independent inspection identified under-deposit attack, set safe controls and avoided an unplanned outage.
Oct 6


Plant Compliance Strategy for Pressure Equipment
Build a plant compliance strategy around AS 3788, independent inspection, clear records and planned maintenance to protect people and production safely.
Oct 4


How to Manage Boiler Findings After Inspection
Learn how to manage boiler findings with a disciplined process for risk control, AS 3788 compliance, repair verification and defensible inspection records.
Oct 2


Can Damaged Vessels Operate? A Safe Assessment
Can damaged vessels operate safely? Learn how AS 3788 inspection, engineering assessment and repair decisions protect people, plant and compliance duties.
Sep 30


How to Verify Inspector Accreditation Properly
Learn how to verify inspector accreditation for pressure equipment, assess AS 3788 competence and retain defensible compliance records across Australia.
Sep 28


Boiler Inspector Versus Maintenance Contractor
Boiler inspector versus maintenance contractor: understand the independent roles that support AS 3788 compliance, safety, and reliable plant operation.
Sep 26


Who Approves Pressure Repairs in Australia?
Who approves pressure repairs? Clarify the roles of asset owners, repairers, competent inspectors and regulators in Australian pressure plant compliance.
Sep 24
bottom of page